HYBRID POWER PLANT WITH ENERGY STORAGE
Technical data
- Primary Energy: SUN, WIND, BIOMASS
- Production: 49,9 MW
Producción de Energía
It is proposed to build a 49.9 MW hybrid electricity production plant, managed by thevehicle company Navalavaca Tecnologías Energéticas.
Developed in 5 Phases from 4 to 15 MW.
Possible Mix of Technologies:
- Photovoltaic installation with 1-axis trackers.
- Generation facility using lean cycle engines for Biomass Syngas.
- Storage facility using 2 x 40ft containers with 10MWh of storage.
- Wind power installation with 3.5 MW wind turbines.