HYBRID POWER PLANT WITH ENERGY STORAGE

Technical data

  • Primary Energy: SUN, WIND, BIOMASS
  • Production: 49,9 MW

Producción de Energía

  • It is proposed to build a 49.9 MW hybrid electricity production plant, managed by thevehicle company Navalavaca Tecnologías Energéticas.

  • Developed in 5 Phases from 4 to 15 MW.

  • Possible Mix of Technologies:

    • Photovoltaic installation with 1-axis trackers.
    • Generation facility using lean cycle engines for Biomass Syngas.
    • Storage facility using 2 x 40ft containers with 10MWh of storage.
    • Wind power installation with 3.5 MW wind turbines.